Working principle of dry mixing mortar complete sets of equipment May 02, 2017

An annual output of two to 30,000 tons of dry mortar production line, in general will be used to 4-6 raw materials, of which two large cans for bulk cement and fly ash, the rest of the small cans for light calcium, heavy calcium, sand, small material and so on. Bulk cement and fly ash cans do not need to upgrade equipment, relying on pump truck into. Light calcium, heavy calcium, sand, small material and so on need to use bucket elevator to the small cans, clever material allocation system support a bucket elevator allocation job, thus avoiding the waste of resources. The metering system is combined with the metering spiral, and the raw material in the silo is imported into the metering bin, and the material metering is realized through the data feedback of the sensor. After the metering of the material, through the spiral conveyor into the main bucket lifting machine, promoted to the mixer top to be mixed bin. To be mixed warehouse pneumatic large open door, can quickly put the material into the non-gravity mixer to achieve continuous production of dry mortar.

Large proportion of cement, such as raw materials can be manually measured through the hoist into the pre-mixing warehouse, cellulose, rubber powder, such as small proportion of precious masterbatch can be measured by electronic scales into the admixture hopper, compared with the simple type of the first further because the mixer after mixing through the valve pocket packaging machine or open pocket packaging machine automatic metering packaging. The belt conveyor can be used to ship to the finished stacking area. It has the characteristics of moderate investment, short construction period, quick investment and so on. Equipment investment generally between 10.35 million, the general production can reach 5-15 tons per hour. Operating workers 3-5, equipment height of 6-10 meters between, covering an area of 20-30 square meters.